V8 Supercars Media & Race Control Building

CASE STUDY

V8 SUPERCARS MEDIA & RACE CONTROL BUILDING

[threecol_one]

  • Elevated Design for optimal race viewing
  • Tinted and Double Glazed Glass Windows with awnings to reduce sun glare and noise
  • 440-volt/3-Phase Power to ensure adequate support for air conditioning and all race control/media centre equipment
  • Industrial Carpet for high trafficflow within building
  • Fully-sealed Media Commentary Room for optimum internal noise control
  • Accessories Included Smoke Alarms and Fluro Lighting
  • Roof Flashing installed for extra protection in case of inclement weather

[/threecol_one] [threecol_two_last]Speedy set-up gives Containers First the win at Sydney 500

Containers First’s entry in last season’s V8 Supercars Championship may not have set any new track records, but it was definitely fast.
[divider]
The Sydney-based shipping container supplier installed temporary Media & Race Control buildings constructed entirely out of steel shipping containers for the popular motorsport’s year-end finale at the Telstra 500 Homebush Street Circuit in Olympic Park precinct – all in just two days.Check out the Video below to see how this shipping container building is built:

[divider]
Whilst 30-odd V8 Supercars roared past pit straight along Australia Avenue in 40ºC heat at over 200km/h, just a few metres from the track Container First’s elevated installation, complete with air conditioning and 3-phase power kept broadcast commentators, Channel 7 technicians, race officials, and tonnes of high-tech equipment cool and comfortable.
[divider]
Containers First used 12 regular 10-foot shipping containers to create the buildings’ foundation, and 9 modified 40-foot shipping containers were hoisted on top to house the media in one section and race personnel in another area. The installation also included an upper-level finishing podium spanning the two buildings.

[/threecol_two_last][divider] [divider][threecol_one]

  • 2 Galvanised Stairs provided sturdy and safe access to and from the buildings
  • 6 Purpose-built Levelling Cradles used to compensate for un-level ground
  • 12 Standard 10’ Shipping Containers used to support upper level and providesecure storage for equipment
  • 9 Interlocking 40’ Modified Containers used for upper level
  • On-site Assembly completed in 2 standard working days
  • Dismantled and Transported from site in less than 1 working day

[/threecol_one] [threecol_two_last]Speedy set-up gives Containers First the win at Sydney 500

The installation provided an exceptional view of the pit straight through tinted and double-glazed glass windows with protective awnings, whilst the climate control and sound dampening materials allowed occupants to supervise and broadcast the three-day event in cool comfort.
[divider]
The media and control centres complex was located between two grandstands (which took eight weeks to install) to accommodate
some of the estimated 170,000 people who attended the event. Because the Home bush race is a temporary circuit, Containers First modular installation provided a fast and economical solution for race organisers and the NSW government. Following the race, the buildings were dismantled, loaded and hauled away by a three-man crew – all in less than a day.
[divider]
When not in use, the modified upper level buildings are stored at Container First’s facilities in South Strathfield, whilst the lower supporting units were placed back into company’s general inventory.

[/threecol_two_last]

Shipping container case study pdf download
Containers First_case study_V8 Supercars_v1

Tick The Box On Your Container Needs!For more information or a quote, please contact us today:Phone 1300 556 991 or email info@containersfirst.com.au23-25 Gould Street | South Strathfield NSW 2136 n F: 02 9642 5008 n ABN: 68 002 196 385
Previous
Previous

School Storage Solutions

Next
Next

Insulated & Temperature Controlled Containers