Containers First

View Original

Endeavor Energy

CASE STUDY

ENDEAVOR ENERGY MOBILE WORKSHOP

[threecol_one]

  • Fully transportable Road, Rail and Ocean freight.
  • Pop up external drawing bench with sun shelter
  • Custom racking and shelving to required specification
  • Floor anchors to tie your load down safely
  • Custom power supply with 10 and 15amp power points and lighting
  • 1 x heavy duty access ramp hung on left door when not required

[/threecol_one] [threecol_two_last]

When build quality, technical expertise and customer service was needed, Endeavour Energy turned to the team at Containers First to build their mobile workshops.
[divider]
Designed in conjunction with the field staff to be ideal for substation projects and made to suit future refurbishment when required. The mobile workshops were acquired for use by the substation crews. The client said“Our field guys have been very happy with the end product, the quality of build and internal fit out has been excellent.”
[divider]
When considering the build, it was found that only Containers First came up with a competitive price, superior quality of build and
shortdelivery timeframe.

[/threecol_two_last]

Shipping container case study pdf download
Conatiners Frist_Case Study_v2_Endeavour

Tick The Box On Your Container Needs!For more information or a quote, please contact us today:Phone 1300 556 991 or email info@containersfirst.com.au23-25 Gould Street | South Strathfield NSW 2136 n F: 02 9642 5008 n ABN: 68 002 196 385